BTM has been selected as a supplier for the entire flower processing system for a new build project involving the construction of a chrysanthemum greenhouse. Firstly, all the equipment required for the construction of an underground central transport system in a well will be delivered. This equipment includes well covers, harvesting systems (cutters, T512 pad unit) and a processing line (T4127). The T4127 will be directly connected to a sleeving machine. After sleeving, the flowers will arrive in bunches at a central packing area via various transport systems. Through intensive cooperation with the customer, the project will reach the desired end result.
Projecten
/ New chrysanthemum greenhouse